Project Cost Controls
For keeping each project's AI cost within a budget you set.
Mac app 0.1.8, signed and notarized.
Download it on your Mac. Development preview
Know what a project costs before the bill does.
Compose each project's AI cost from recorded usage and the billing assumptions you set. Keep a budget, watch the trend and get an alert with the usage behind it.
Budgets you can check.
Set a budget per project
Create or revise a project budget with revision checks. Know which projects are close to their limit before the period ends.
Alerts with their evidence
Check budgets in batches and keep near and over alerts, without repeats, in an inbox on your Mac. Open the usage and conversations behind an alert instead of guessing.
Reviews you can cite
When you ask, send the cost evidence to the model you set up and save the review with a copy of that evidence. Reread a review later without repeating the model call.
Also in Project Cost Controls
Compare like with like
Compare equal-length adjacent periods, keeping gaps and coverage visible. See a real change rather than a missing day read as zero.
Fees from your own assumptions
Read the dated price card and the subscription fees you supplied. Every cost names the assumption it rests on.
Let your agent watch the budget
Use the same checked actions through HopperBot. Ask for a project's cost and its evidence in your own workflow.
Details
- Desktop release
- 0.1.8 for Mac
- Audience
- Free
- Agents
- Integration Studio, once admitted
Project Cost Controls
Stay inside the budget you chose.
Mac app 0.1.8, signed and notarized.